article top
The City on Sunday announced two traffic measures as part of the Beachwalk Wastewater Emergency Bypass project.
Starting Wednesday, July 5, the Diamond Head entrance to Ala Moana Beach Park will have a temporary detour and possible closures over the next 30 days. This is the entrance directly across from Atkinson Drive.
Contractors will be grouting and then trenching the road just inside the park entrance to connect an emergency 42-inch wastewater pipe to the existing wastewater system.
Also starting July 5, a five-block stretch of Ala Wai Boulevard will be affected for an estimated six months by standby pumps that will be placed along the canal